Before committing to the home building and buying process, plenty want to know what they’re signing up for, primarily in the form of time and monetary commitment. There’s a lot that goes in to calculating the cost of a home, and likewise, the time frame within which one can expect completion.
Factors like the complexity of the project — the land on which the home is being built, the area where the home is being built, and the intricacy of the home’s floor plan — will affect the building timeline. Custom homes can take longer to complete than production homes, while manufactured homes typically can be completed in a few months.
Average Time it Takes to Build a Home
According to the 2022 Survey of Construction from the Census Bureau, the average completion time of a single-family home is around seven months.
Caveats and points of clarification: Several factors affect the time it takes to build a new house, with two primary factors being “construction style” (i.e., custom home versus production home) and the region and/or environment in which the home is being constructed. The average time to build a new home was calculated for these different scenarios.
Average Construction Time By Home Type
Home Type | Average Construction Time |
Custom Homes | 8.9 months |
Production Homes | 6.1 months |
It’s no surprise to anyone that custom homes take longer on average to build, but depending on your timeline, the length of time may be comparable to that of a production-built home.
Average Construction Time By Region
Region and Environment | Average Construction Time |
---|---|
Northeast | 11.1 months |
Midwest | 7.7 months |
South | 6.1 months |
West | 7.1 months |
The averages calculated are for new home construction projects, from start of construction through final walkthrough. In other words, the pre-construction (and permit-approval processes) is finalized and complete (and, therefore, not included in the averages).
The last key factor that causes high variance in the time it takes to construct a new home is “unplanned changes.” When buyers insist on features or functionality of their new-construction home during the building process (i.e., changes that were not scoped during the planning phases), delays in the process are almost always the result.
After speaking with the experts, we’ve identified the five most commonly cited factors influencing construction time: pre-construction and permits, environment, workers and supplies, changes and construction style. Although knowing what to expect may not speed up the process, it might just help you maintain your sanity.
Pre-Construction and Permits
Before a builder can start building your home, the home’s lot must be prepared. That means clearing trees, rocks and other items, rough grading and leveling for the foundation. Depending on how much work is involved — say there’s an unexpected issue while clearing the lot — there can be delays during pre-construction.
Getting proper approvals and permits can also cause delays. “Factors like approval on building permit and inspections process can vary between locations and can lengthen the time to a completed home,” says Matthew Gaudet-Walters, a sales representative for Walters Homes.
Environment
Depending on where the home will be, building times can be affected by region of the country — homes in the Middle Atlantic Region averages about 9.5 months from start to completion, while the Mountain Region construction averages around six months. Construction in metropolitan areas is usually quicker — seven months, compared to nine months in more rural areas.
“Although construction workers can do a lot of work in the rain, such as trenching or cutting down trees, there are some things that can be held up because of the rain,” says Kyle Alfriend, a Realtor with the Alfriend Group in Dublin, Ohio. “Primary weather factors — including the winter freeze — prohibits the pouring of concrete for the foundation and spring rains saturate the ground so much that holes cannot be dug for basements without walls caving in.”
Availability of Workers and Supplies
The summer months are generally the busiest time for home construction, so you might find your new home’s construction delayed while waiting for the necessary labor to be available.
“One element in our construction time calculations is the available labor pool and how which specialists are needed among the subcontractors, like the electricians, plumbers and framers that the design calls for,” says Peter Di Natale, president of Peter Di Natale & Associates, a New York-based homebuilder and contractor.
Changing the Plan
Change orders will usually extend the build time, especially if they occur in the latter part of the process.
Di Natale also notes that when buyers wait until the last minute to choose their finishes, this can cause delays. “For example, cabinets usually take six to eight weeks to order and one to two weeks to install, so selecting cabinets when it is time to install them will cost you two months or more.”
To limit the amount of time lost to decision delays, you should maintain open communication with your builder. After all, throughout the construction process, there will be many decisions that you must make along the way.
Construction Style
The style of your home will also influence construction time. Custom-built homes average around nine months, while personalized production plans average near seven months. Because the floor plans used by production builders have been built many times before, there are generally fewer delays. “Choosing a standard floor plan will quicken the building process, because it eliminates any variations that the builder will need to work out,” says Gaudet-Walters.
So what can you do to make sure the construction of your new home is as painless as possible?
Collaboration is the key: “Engaging construction managers and going through adequate pre-planning and estimating as early as possible will save time and money in the long run,” says Di Natale. Delays in construction may be a fact of life, but knowing what to expect and how to manage your expectations can help make the building process less stressful.
Seve Kale is an award-winning freelancer writer and former content intern for NewHomeSource. She graduated from the University of Texas at Austin in December 2013 with a degree in Government, Humanities and Spanish.
Prior to working with NewHomeSource, she interned in the Press Section at the U.S. Embassy in Buenos Aires and traveled extensively throughout South America
Kathy Reid
Gave down payment first week last October 2020. Signed contract. October 31 paid for particulars such as paint color, brick, roofing, cabinetry, hardware, lighting, etc. Closing was scheduled April 29 this year 2021. Closing rescheduled three times and now is scheduled September 29. Various excuses. Other homes in neighborhood which haven’t sold are further along than ours with driveways, landscaping, sidewalks. Same contractor. I think he wants us to walk, lose our deposits ($20,000), so he can sell to another buyer and make even more. Home only 2100 square feet. Other homes larger than ours, more expensive. Can you give us an explanation as to why?
Jamie Garcia
Hi Kathy,
You need to talk with the builder about the issues you are experiencing, as well as obtain a lawyer.